Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long

Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve (Lead-Free Brass), 10.5" Long

5 reviews
SKU: B083LJV1N2
Prix habituel
$11.69
Prix habituel
$13.14
Prix soldé
$11.69
Hurry, only 0 item(s) left in stock!
Size: 10.5" Lead-Free


Shipping Discount

Volume shipping discount apply on all orders over $1,500.

Orders with a maximum 150 lbs. package weight arrive within 3-21 business days Worldwide. *Not a guaranteed time – excluding Saturday/Sunday delivery.

No International Returns

Other Merchant Websites claim "Free Shipping," but Shipping is never free! "Free shipping" only means higher product pricing to cover the average shipping cost or using profits from some products to offset losses on another. Someone must pay couriers for their work.

As for us, we believe in transparency and are proud to showcase products' "Prices" separate from the shipping cost respectfully. We are showing you and giving you cost-saving delivery options.

We ship directly to you using Amazon Fulfillment Services, Local and International Ocean and Air Freight Forwarders, FedEx, or DHL Delivery.
We have warehouses in the United States, United Kingdom, Dominican Republic, The Bahamas, and China to expedite and facilitate your orders.
Depending on which warehouse processes the orders, they can be tracked via video at every step.

NO RETURNS on International Orders. With all our effort to lower the cost and the ease of International shopping, WE CAN NOT ACCEPT INTERNATIONAL RETURNS AND REFUNDS.


To minimize any error, we inspect each product before shipping them. Ensure you purchase shipping insurance coverage during checkout.
If you believe you received the incorrect product, damaged or defective item, please reach out to our Customer Solutions team within 7 days of delivery. Returns are handled on a case-by-case basis, and requirements vary by country.

If you need to return a product to us, you'll be the exporter from the original shipping destination. You will be responsible for compliance with that country's export laws and fees to return to our Main U.S Warehouse; clear photos of the item's condition, the product number, and the original packaging must be sent upon return request.

Size: 10.5" Lead-Free

Recently Viewed Products

Customer Reviews

Customer Reviews

Based on 5 reviews
0%
(0)
100%
(5)
0%
(0)
0%
(0)
0%
(0)
W
Wayne Morris
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to M...

Excellent quality, very happy with it. Worth every penny!

A
Anna Lee
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to M...

The packaging was great and the product works well. Perfectly functional

C
Christina Mason
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to M...

Very good Great value for money

T
Tyler Walters
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to M...

Amazing! Worth every penny!

D
David Swanson
Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to M...

Just what I needed, works perfectly! Would buy again!